Project Name Year
<< < [1] 2 > >>
--------------------------------------------
*DESIGN OF TECHNOLOGICAL EQUIPMENT2007 - 2014

1. Development of a Technical design, Technological part of a semi-industrial installation for Incineration of Radioactive waste for KNPP
2. Development of a Detailed design of part Safety Analyses Report for the installation of 5HG53÷5HG58, 5HG60÷5HG68 and 6HG60÷6HG for the project “Kozloduy NPP Units 5 and 6 Planed maintenance 2007”
3. Development of a Installation Design for “Indication of safety parameters” for KNPP
4. Development of a Technical design and Detailed design for “Replacement of the existing bridge crane 16 t capacity in Wet Spent Fuel Storage Facility” for KNPP
5. Development of a Detailed design for “Equipment of trailer for SNF transportation” for KNPP
6. Development of a Technical and Detailed design for “Reconstruction and modernization of the control system of bridge electrical cranes 80-16-25-ЗК-УЗ (0UQ04E22, 0UQ01E04)” for KNPP
7. Development of a Detailed design, part Automated Process Control Systems, “Installation for Biodiesel Production and technological tanks and raw materials” for “SLUNCHEVI LUCHI BULGARIA” PLC
8. Development of a Detailed design “Taking down, development and verification of the Main electrometer panel at the „RAW – Novi Han” site”
9. Development of a Detailed design “Outside water-conduit fire-extinguishing installation at the „RAW – Novi Han” site”
10. Development of a Detailed design “Construction of 5 t crane for the Hot cell at „RAW – Novi Han” site”
11. Development of „Installation schemes and bills of materials” to Terms of reference for execution of “Installation and commissioning of monitors for control of rare gases NGM 204L, gamma ray monitors GIM 204 and neutron measurement monitors NIM 201” for Sofia Research Reactor IRT 2000 at INRNE of the Bulgarian Academy of Sciences
12. Elaboration of Detailed Design suitable for obtaining Construction Permits for the SREM Photovoltaic Project, and for designing the Photovoltaic installation
13. Technical design and preparation of Tender documentation for “Design and safety assessment for licensing the construction L/ILW Radioactive Waste National Repository”
14. Elaboration of Technical design in order to build a surveillance system for municipal property objects in the Municipality of Svilengrad
15. Development of the Technical design and preparation of Tender documentation for the project “Design and safety assessment for licensing the construction of Saligny L/ILW national repository” in Cernavoda NPP, Romania
16. Elaboration of the technical documentation in English language applicable to the project “Engineering, Procurement and construction of a radwaste retrieval facility” in Rovno NPP - Ukraine”
17. Technical design documentation for the equipment used during the dismantling of Brennelis NPP, France
18. Preparation of a Detail design documentation for testing loop and retrieval equipment to extract 100kg of waste in ECT tanks at KNPP
19. Conceptual and Technical design of retrieval equipment (Phase 2)
20. Technical design of tender solution for ECT Phase 2 project.
21. Concept adaptation of ALGETA project ECT Phase 2.
22. Project 9 b Retrieval and processing of evaporated concentrate from ECT phase 2 NPP “Kozloduy”
Technical and Detail design Lot 1 - Retrieval equipment
Technical and Detail design Lot 2 - Waste preparation
Technical and Detail design of Lot 2 BIS – Condenser
Technical and Detail design of Lot 3 – Waste separation
Technical design of Lot 6 – I&C
Technical and Detail design of Lot 7- Conveyor cooling
Technical and Detail design of Lot 8 – Borate container
Executive studies of Lots 1-3-6

--------------------------------------------
*MANUFACTURING OF TECHNOLOGICAL EQUIPMENT2007 - 2014

1. Construction of the Automated Control System for auxiliary facility of the “Installation for Biodiesel Production and technological tanks and raw materials” for “SLUNCHEVI LUCHI BULGARIA” PLC
2. Manufacturing and delivery of 15 stainless steel baskets
3. Manufacturing and delivery of 15 G1&G2 carbon steel containers
4. Manufacturing of the retrieval equipment to extract 100kg of waste in ECT tanks at KNPP

--------------------------------------------
*INSTALLATION OF TECHNOLOGICAL EQUIPMENT2007 - 2014

1. Supply and dismantling of old equipment, assembling and adjustment of new equipment for the project “Preparation of design documentation for complex of technical devices for controlling safety systems” for KNPP
2. Assembling activities for the project “Replacement of the existing bridge crane 16 t capacity in Wet Spent Fuel Storage Facility” for KNPP
3. Assembling activities for “Equipment of trailer for SNF transportation” for KNPP
4. Assembly activities for the project “Installation of three lamellate heat exchangers completed with filters for heat removal system of pools for SNF storage” for KNPP
5. Assembling activities for the project “Reconstruction and modernization of the control system of bridge electrical cranes 80-16-25-ЗК-УЗ (0UQ04E22, 0UQ01E04)” for KNPP
6. Assembling activities for the project “Construction of 5 t crane for the Hot cell at „RAW – Novi Han” site”
7. Modification of Preindustrial installation for retrieval and processing of evaporated concentrate - project 9b Phase 2 ECT KNPP
8. Test installation for filters qualification intended for Preindustrial installation for retrieval and processing of evaporated concentrate - project 9b Phase 2 ECT KNPP

--------------------------------------------
*FUNCTIONAL TESTS2007 - 2014

1. Functional tests of the equipment for the project “Replacement of the existing bridge crane 16 t capacity in Wet Spent Fuel Storage Facility” for KNPP
2. Functional tests of the “Equipment of trailer for SNF transportation” for KNPP
3. Functional tests of the equipment for the project “Installation of three lamellate heat exchangers completed with filters for heat removal system of pools for SNF storage” for KNPP
4. Functional tests of the equipment for the project “Reconstruction and modernization of the control system of bridge electrical cranes 80-16-25-ЗК-УЗ (0UQ04E22, 0UQ01E04)” for KNPP
5. Functional tests of the equipment for the project “Construction of 5 t crane for the Hot cell at „RAW – Novi Han” site”
6. Factory acceptance tests of 15 stainless steel baskets”
7. Factory acceptance tests of 15 G1&G2 carbon steel containers”
8. Factory acceptance tests of main equipment of Testing loop for treatment of waste in ECT tanks at KNPP
9. Factory acceptance tests of retrieval equipment to extract 100kg of waste in ECT tanks at KNPP
10. Test installation for filters qualification intended for Preindustrial installation for retrieval and processing of evaporated concentrate - project 9b Phase 2 ECT KNPP

--------------------------------------------
*COMMISSIONING2007 - 2014

1. Commissioning of bridge crane for the project “Replacement of the existing bridge crane 16 t capacity in Wet Spent Fuel Storage Facility” for KNPP
2. Commissioning of the “Equipment of trailer for SNF transportation” for KNPP
3. Commissioning of the equipment for the project “Installation of three lamellate heat exchangers completed with filters for heat removal system of pools for SNF storage” for KNPP
4. Commissioning of the equipment for the project “Reconstruction and modernization of the control system of bridge electrical cranes 80-16-25-ЗК-УЗ (0UQ04E22, 0UQ01E04)” for KNPP
5. Commissioning of the Automated Control System for auxiliary facility of the part Automated Process Control Systems “Installation for Biodiesel Production and technological tanks and raw materials” for “SLUNCHEVI LUCHI BULGARIA” PLC
6. Commissioning of the equipment for the project “Construction of 5 t crane for the Hot cell at „RAW – Novi Han” site”
7. Test installation for filters qualification intended for Preindustrial installation for retrieval and processing of evaporated concentrate - project 9b Phase 2 ECT KNPP

--------------------------------------------
< < [1] 2 > >>